Muffin Monster Grinds Down Pump Station Repair Costs

otter-creek-muffin-monster

To prevent pump ragging for good and eliminate the cost of vacuum truck services – the town installed a Muffin Monster sewage grinder.

When Otter Creek Water Reclamation District was faced with expensive reoccurring clean-up costs because of rags, wipes, flushables and debris at their largest wastewater pump station, engineers solved the problem with a Muffin Monster sewage grinder.

The Village of South Elgin, established in 1897, is a picturesque community that attracts visitors and new residents with its old world charm. Located about 40 miles northwest of Chicago, Illinois, the Village’s 22,000 residents rely on three wastewater pump stations. The largest of these is located at the Thornwood Lift Station where flow to the station is about 490 gpm (110 m3/h) and three 40-hp (30 kW) pumps need to move sewage at about 600 gpm (136 m3/h) @ 36’ (11m) TDH. Here, build-up of rags, trash wrappings and other debris were clogging the system and forcing it offline. This necessitated regular cleanings totaling over $19,000 per year…

Learn how they solved their expensive reoccurring clean-up costs caused by flushables >

Comments are closed.